Dosimetry

Dosimetry and Treatment Planning

Director led treatment planning support that reduces backlog, improves turnaround time, and standardizes plan quality across your program.

Dosimetry Director led • Remote and hybrid coverage • IMRT VMAT SBRT • Standard templates and handoffs • Turnaround targets and KPI cadence

Schedule a Discovery Call

24 Hour Ready

202-800-6222

Request Dosimetry Support

Services

What we deliver

Select a service to see scope details.

Director Led Planning Operations

A Dosimetry Director manages standards, workload, and performance.

  • Single accountable lead
  • Templates and standards
  • KPI cadence

Remote and Hybrid Planning Coverage

Add capacity without disrupting onsite clinical operations.

  • Flexible coverage 
  • Backlog support 
  • Volume scaling

Planning Turnaround Support

Defined intake and priority rules to hit predictable timelines.

  • Intake checklist 
  • Prioritization 
  • Escalation pathway

Advanced Technique Planning Support

Planning support aligned to your technique mix and site preferences.

  • IMRT 
  • VMAT
  • SBRT and SRS support

Standardization and Handoffs

Reduce rework through templates, naming conventions, and clean handoffs.

  • Templates 
  • Checkpoints 
  • Documentation consistency

Surge and Backlog Relief

Short term support when volume spikes or staffing gaps occur.

  • Defined scope
  • Priority rules
  • Daily status

Planning timelines

Planning timelines we can support
Timing depends on complexity, approvals, and site workflow. Typical targets after onboarding and calibration:

Routine plans: 1 to 2 business days

Complex plans: 2 to 4 business days

SBRT and SRS: 2 to 5 business days

Surge backlog relief: accelerated targets with defined scope

How we go live

Typical timeline to go live

TNM strengthens program consistency through physician led structure that supports safe delivery and predictable operations.

Discover: confirm volumes, techniques, systems, and turnaround targets.

Onboard: align templates, naming conventions, handoffs, and checkpoints.

Pilot: calibrate site preferences with early plans and feedback loop.

Deliver: steady coverage with KPI cadence and continuous optimization.

#director-led

Director led planning operations

A Dosimetry Director leads the engagement to keep planning consistent and predictable.

Includes:

  • Planning standards, templates, and naming conventions
  • Workload distribution and daily prioritization
  • Communication expectations and escalation pathways
  • KPI cadence for turnaround time, backlog, and rework

#remote-hybrid

Remote and hybrid planning coverage

Add capacity without disrupting onsite operations, built around your review and approval workflow.

Includes:

  • Plan intake checklist and priority rules
  • Clear handoffs for review and revisions
  • Turnaround expectations by plan type
  • Surge coverage options for volume swings

#turnaround

Planning turnaround support

Turnaround improves when intake requirements and checkpoints are clear.

Includes:

  • Intake requirements that reduce missing information
  • Priority tiers for urgent and routine cases
  • Revision loop structure and response expectations
  • Weekly review of turnaround performance

#advanced-techniques

Advanced technique planning support

Planning support aligned to your technique mix and site preferences.

Includes:

  • IMRT and VMAT planning workflows
  • SBRT planning support
  • SRS planning support where applicable
  • Site specific templates and review checkpoints

#standardization

Standardization and handoffs

Reduce rework by standardizing how plans move from intake to approval.

Includes:

  • Standard templates and planning preferences
  • Naming conventions and documentation standards
  • Review checkpoints with physics and physician teams
  • Escalation rules for changes and urgent needs

#surge

Surge and backlog relief

Short term support that stabilizes planning during staffing gaps or volume spikes.

Includes:

  • Defined scope and surge window
  • Daily capacity targets and priority rules
  • Daily status updates and backlog tracking
  • Transition plan back to steady state coverage

Technique and planning scope

3D CRT, IMRT, VMAT

SBRT planning support

SRS planning support where applicable

IGRT aligned planning workflows

EBRT

HDR and LDR support where applicable

Outcomes

Outcomes that matter

Predictable turnaround time and fewer delays

Backlog reduction during staffing gaps or volume spikes

Consistent plan quality through standards and checkpoints

Reduced rework through clean handoffs and documentation

Ready to improve planning throughput and turnaround time

Share your technique mix, weekly plan volume, target timelines, and systems. TNM will propose a Director led coverage model and a go live plan.
Scroll to Top